Template 02 · Starved / blocked observation
Vol. I · Shop-floor form · A4

Starved / blocked observation

Stand in front of the line, watch each machine for 25 cycles. Tick S if it waits for upstream (starved), B if downstream is full (blocked). The bottleneck is the machine with the fewest ticks of either.
Date
Line
Observer
Start time
Sample interval

5 stations × 25 observations

Mark S, B, or — (running) in each cell · left-to-right, top-to-bottom
Station 01S / B
Machine ____
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Station 02S / B
Machine ____
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Station 03S / B
Machine ____
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Station 04S / B
Machine ____
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Station 05S / B
Machine ____
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Σ starved
__
Σ blocked
__
Σ running
__
Bottleneck station
__
% utilization
__ %

Read the result

S upstream not delivering → look before this station.

B downstream full → look after this station.

Station with fewest S+B and most running = the bottleneck.

Method

1. Sample every 30 s for 12 min 30 s (= 25 obs).

2. Always look at the same instant for all stations.

3. Repeat 3× per shift to filter out random events.

Observer signature
Supervisor signature